Our global journey started from 2005 by teaming up with our partners. In the years ever since, we have expanded our global footprint from the Middle East to Southeast Asia and Central Asia. Leveraging our strengths in construction, construction management, and integrated EPC capabilities, we have delivered construction projects, EPC projects either on our own or by teaming up with our international partners like Fluor, SNC-Lavalin, Aker Kvaerner, Technip, Intecsa, Toyo Engineering, SK E&C, CTCI, among others. Flagship projects include the Polyolefins Project for SABIC, the Hydrocracking Unit for SAUDI ARAMCO, the Sulphuric Acid Plant and Power Plant for Ma'aden, and the Saudi Kayan Natural Detergent Alcohol Project for Saudi Kayan Petrochemical Company.
Flagship Projects:
Sulphuric Acid Plant and Power Plant, Saudi Arabian Mining Company (Ma'aden)
This is the first project we delivered to Ma'aden through a consortium with SNC-LAVALIN. The project consists of a 3x1.8 MMTPA sulphuric acid plant and a 92.6 MW power plant. Fabrication of pipes, ducts and storage tanks were performed in our in-Kingdom fabrication facility.
Saudi Kayan Natural Detergent Alcohol Project, Saudi Kayan Petrochemical Company
We delivered this plant as an EPC contractor. An OOK contract and an IK contract were involved. Engineering was performed according to the international standards. Equipment and materials were sourced from European, American and Asian suppliers. The plant was inaugurated in April 2015. It truly demonstrates our integrated in-house capabilities in engineering, procurement and construction and serves as a stepping stone for our future growth in the global market.
2x3 MMTPA Hydrocracking Unit, Saudi Arabian Oil Company (SAUDI ARAMCO)
We delivered this project by the end of 2013 by teaming up with Technip. Back then, the plant came with the biggest capacity and highest pressure in the world.
Polyolefins Project, Saudi Basic Industries Corporation (SABIC)
We were awarded the USD 750 million EPC contract as a JV (with Aker Kvaerner and our sister company SSEC) by SABIC in 2005. This was the very first EPC project we delivered in the global market.
Global Operation | ||||
No. | Owner | Project | Scope | Year |
1 | SABIC | Yanpet EG2 | EPC | 2020 |
2 | SAUDI ARAMCO | Crude oil pumping system upgrade | EPC | 2020 |
3 | Enter Engineering PTE. LTD | Samarkand Fertilizer Complex, Uzbekistan | E | 2019 |
4 | SAUDI ARAMCO | Fire fighting system upgrade | EPC | 2019 |
5 | SAUDI ARAMCO | HMU revamp project at Luberef II, Yanbu - P&C LS | PC | 2019 |
6 | SABIC | Benzene off gas from PK to UNITED | EPC | 2019 |
7 | SAUDI ARAMCO | CPRO #24-Site development package for replace emergency steam turbine generators RTR | C | 2019 |
9 | SAUDI ARAMCO | Increase pumping capacity at Qatif | EPC | 2018 |
8 | SABIC | New mixed C4 export line from SHARQ Olefins plant to Petrokemya | EPC | 2017 |
10 | Ma'aden | Unconventional gas pipeline | C | 2017 |
11 | Saudi Kayan | New demineralization Package 3rd train in U&O plant | EPC | 2017 |
12 | Malaysian Phosphate Additives (Sarawak) Sdn. Bhd. | Integrated Phosphates Complex, Malaysia | E | 2016 |
13 | SAUDI ARAMCO | FADHILI Gas Program (FGP) project ELECTRO ‐MECHANICAL ERECTION PK 2, 3, 5, 6 | C | 2016 |
14 | SAUDI ARAMCO | BI-10-01273, JUBAIL bulk plant interface facilities | C | 2015 |
15 | Ma'aden | Umm Wu'al Phosphate Project - Utilities and Infrastructure at Umm Wu'al - U&I Multidiscipline Contract | C | 2014 |
16 | IBN SINA | Polyoxymethylene Project | C | 2014 |
17 | Saudi Royal Commission | Infrastructure of Jubail 2, Stage 3 (Seawater Cooling) | C | 2014 |
18 | Ma'aden | Sulphuric Acid Plant and Power Plant | EPC Consortium | 2013 |
19 | SABIC | BTX/ Pygas line from Petrokemya to Saudi Kayan EPC LSTK | EPC | 2013 |
20 | United Chemical Company Limited Liability Partnership | Production of yellow phosphorus and trermal phosphoric acid project. | FSR | 2013 |
21 | LFC - Lao Cai Chemicals Fertilizer JSC | Vietnam Lao Cai 160 kt/a WPA Plant | E | 2012 |
22 | SAUDI ARAMCO | RTIP Interconnecting Facilities | PC | 2012 |
23 | SAUDI ARAMCO | WASIT Gas Development Project | C | 2011 |
24 | Saudi Kayan | Saudi Kayan Natural Detergent Alcohol Project | EPC | 2011 |
25 | SAUDI ARAMCO | Yanbu Export Refinery Project Crude Package | C | 2011 |
26 | SABIC | Ibn Rushd II PTA DBN Project | C | 2011 |
27 | Saudi Kayan | SK-KEMYA Hydrogen Pipe Line Project | EPC | 2011 |
28 | Saudi Kayan | Amines Facilities | C | 2010 |
29 | Saudi Kayan | JER Package 2A-Conversion | C | 2010 |
30 | Saudi Kayan | Crude oil boiler project | C | 2009 |
31 | Saudi Kayan | Port area and port tank farm | C | 2009 |
32 | Saudi Kayan | U&O PipeRack 4 | C | 2009 |
33 | Saudi Kayan | Flare Area | C | 2008 |
34 | Saudi Kayan | BBTX Project | C | 2008 |
35 | Saudi Kayan | 700 KTA EO/EG Project | JV EPC | 2006 |
36 | SABIC | Polyolefins Project (PP,PE,PHU Unit) | JV EPC | 2005 |