B0101 Substation of RTIP Project in KSA Successfully Energized

On  September 4, the B0101 substation of the RTIP piperack project undertaken in KSA  was successfully energized on first try, achieving another key milestone in the  project.

Despite  various additional changes and revisions in later stage of substation design and  punch list items from stringent auditing by Client, the PMT made overall  coordination, and carried out timely communication and coordination with EPC  contractor and Client and take decisive steps to ensure smooth progress for the  changes and punch list items.

In  order to ensure smooth energizing of the substation, the PMT prepared detailed  plan for energizing, and conducted detailed inspections for all electrical  equipment, indoor lighting, indicators, safety passages, fire alarm and fire  fighting systems, and provided cordon areas in advance, and assigned dedicated  personnel for watching, and made sufficient preparation for energizing.  

The  successful energizing of the B0101 substation has paved the way for  commissioning of the top priority fuel gas system by Client and subsequent motor  testing for the plant.

信息来源: 
2022-04-19