On September 10, PMT for Zhongtian Hechuang Energy Project was given the “Civilized Construction Site” award in the special rectification campaign for civilized construction by Client.
The PMT paid high attention to this special rectification campaign with proactive communication and strict management according to the specifications and procedures. In terms of overall planning, each road is made clean and smooth for traffic, green fence is provided in the construction red-line area for effective isolation from the outside. Field fabrication area, material laydown area, container area and scaffold sample area are planned in an orderly fashion; during the construction work, after soil excavation, backfilling and land leveling were done strictly according to the elevations, protection for equipment foundation was provided, foundation pit protection and scaffold erection for work at height protection were done strictly according to the code requirements; for management of prefabrication area, the prefabrication area and material laydown area are planned and marked clearly, protections were provided for various types of equipment, construction materials, finished products, semi-finished products are stored according to the material specifications in an orderly fashion, waste bins, trash bins and material boxes are provided with clean marking; in terms of HSE management, each area is provided with HSE supervisors according to the code requirements, and all-process supervision is carried out to make sure all personal on site will wear proper PPE, and carry out the construction activities strictly according to the HSE management regulations; in addition, the PMT also hang banners on the green fence and visible areas of the plant for corporate culture, safety, quality and civilized construction, which not only express our corporate culture, but also promote the site HSE and quality management, but also give the construction area a pleasant appearance.