Recently, the Construction Team of SEI Beihai Refining Revamp Petrochemical Project Department sent a letter of commendation to SNEI to commend SNEI for the excellent and efficient performance in completing the assembly and welding and associated works for the seven 3,000m3 LPG spherical tanks using state-of-the-art construction method and standardized management method during the construction of the LPG tank farm and pump shelter for the Beihai Refining Relocation and Revamp Petrochemical project. SNEI Storage Tank Branch Company undertakes the construction for this project. By strictly following the “Management Manual for Project Construction” and “Key Process Confirmation” rules developed by SNEI Storage Tank Branch Company, and also by strengthening control of various project management aspects, the site construction management team has worked proactively, listened to suggestions from various parties, overcome many difficulties, and made sure the project is completed on schedule, which has been highly commended by the Client and the Supervision Contractor alike. In the end of September, the Owner inspected the project, the once-through rate for the hold points was 100%, and the average once-through rate for the welding of the seven spherical tanks was 99.16%, the once-through rate for welding of process pipes was 99.03%. The overall quality is excellent, which is a showcase of the advantages and professional capabilities of SNEI in the construction management organization for large-sized spherical tank farm.